Risk Aspects Form

Guidance Documentation for Risk Assessments & Management

Risk Aspects Form

In the image below the Risk Aspects form is shown:

4)   Tab 1) Risk Assessment Setup contains the Risk Assessment Set Id (RA SetId), which defines the boundaries for the evaluation of the assessment, (e.g. Very Low, Low, Moderate, High, or Very High).

5)   Tab 2) Description / Purpose of the Risk Assessment

6)   Tab 3) Aspects of the Risk contains the list table "Aspects of the Risk Assessment". The Aspects of the Risk list table may contain to hundreds, as practical.

7)   The Risk Aspects form contains five Tabs: 1) General Description; 2) Additional Consequences; 3) Mitigation / Treatment Actions; 4) Impact on Business Statement; 5) Controls

8)   List table of controls relevant to the Risk Aspects.

9)   Pre-mitigation calculator Risk Priority Number (RPN) = Probability x Severity of Impact x Detectability.

10) Post-mitigation calculator Risk Priority Number (RPN) = Probability x Severity of Impact x Detectability.

11) The edit button (with the "Delta-icon") opens the Risk Aspect Control Form.

RA4Nist-800-171-AspectForm-Controls

Related Topics

Apply Post Treatment and Update the RPN

Risk Aspect Controls Form

AS9100 D Implementation & Templates Kit

 

ISO 9001:2015 Implementation & Templates Kit

 

iso_internal_auditing_logo

Online Internal Auditor Training Course ISO Management Systems

Click here for Details


for International Management Systems

for International Management Systems

+1 800 644 2056

abci-consultants.com

 

Tags: quality management software, corrective action software, iso management software

 

Published by ABCI Software Solutions | ABC ISO Consultants

Online & Onsite ISO Auditor and Awareness Training | ISO Certification Services | ISO Resources

Copyright © Access Business Communications, Inc.