The Risk Aspect module form is configured with 4 main Tabs or sections:

1.The General Tab contains information about the failure (generic for incident, breach, non-conformance). The assessment calculation tool (pre and post mitigation results) is designed for rating or assessing a specific aspect of the Risk identified and associated in the Risk Assessment Table. Therefore, a one to many relationship exist between the Risk (parent table) and the Aspects (child table).

2.Tab 2) contains fields for additional consequences.

3.Tab 3) contains fields for mitigation or risk treatment actions.

4.Tab 3) contains a method of generating risk impact statement based upon availability, confidentiality, integrity and financial effect.

 

1) General tab

A.In the form image below, Describe the failure and the failure mode.

B.Describe what may cause the failure and the failure effect.

C.The impact values for calculating the Risk Priority Number (RPN) (pre-mitigation treatments); see the look-up table for impact values: RPN = Probability (P) * Severity (S) * Detection (D)

D.The impact values for calculating the Risk Priority Number (RPN) (post-mitigation treatments);

E.Look-up Tables for Response to Risk Aspect and the current/last Status of the Risk Aspect.

F.The RPN can report the pre or post-mitigation action [√] RPN Post Mitigation Action is check-box.

RiskAspectForm

 

See the Terminology used in Risk Assessments.

ISO Internal Auditor Training Course

Online Internal Auditor Training Course ISO Management Systems

Click here for Details


ABC-ISO-logo

+1 800 644 2056

abci-consultants.com

 

Published by ABCI Software Solutions | ABC ISO Consultants

Online & Onsite ISO Auditor and Awareness Training | ISO Certification Services | ISO Resources

Copyright © Access Business Communications, Inc.